| 1. | The transformer substation survived the blast with relatively minor damage to the essential components . 经爆震波袭击后未被毁坏的变电站的重要组件受到较小的损坏。 |
| 2. | Analysis on fault of transformer substation running 变电站运行过程中的故障现象分析 |
| 3. | Long - distance monitoring system of the transformer substation 网络服务器机柜监控系统 |
| 4. | Computer testing control in transformer substation 变电站的微机检测与控制 |
| 5. | Computer testing control in transformer substation 变电站的微机检测与控制 |
| 6. | Development of a gps - based clock used for transformer substation 的变电站用时钟的研制 |
| 7. | The problem of phase order in transformer substation ' s erection 变电所安装中的相序问题 |
| 8. | Achievable unmanned power transformer substation 无人值班变电所的实现 |
| 9. | Technology parameter of box transformer substation 箱式变电站技术参数 |
| 10. | Standard design for 110kv integrated automatic transformer substation 综合自动化变电站标准设计 |